Fully custom design mobile truck unloading, stockpiling, reclaiming and barge loading facility in Sierra Leone

 

In 2012 Telestack installed a fully customised design mobile truck unloading, stockpiling, reclaiming and barge loading facility in Sierra Leone.  This turnkey solution was delivered as part of London Mining Company’s Phase 1 investment and Telestack’s Sales Engineers worked closely with LMC management and LMC consultant on the project, Ausenco, to deliver the bespoke turnkey solution.  The project consists of various stages, which ensure maximum operational flexibility for the operator.

This fully customised system shows Telestack’s commitment to our customer base, in designing, manufacturing and installing heavy duty mining specification units to meet the needs of the application. This system can be utilised for all mining companies in existing mines or new mines that are opening up, especially in remote locations for typical phase one of installations globally to start the mining process.

To find out the full details on this case study click on Download Case Study

Case Study Highlights

  • Country / Region: Sierra Leone, Africa
  • Product: 150 Tonne Hopper, Link Conveyor, TS 850 Radial Telescopic Stacker, HF1515 Mobile Reclaiming Hopper & TS1550 Radial Telescopic Shiploader
  • Application: Mobile truck unloading, stockpiling, reclaiming and barge loading facility
  • Material Type: Iron Ore
  • Tonnage: 1500 TPH
  • Download Case Study