BARGE LOADING EFFICIENCY ON THE THAMES

 

London relies on a 150-year-old sewer system built for a population less than half its current size. As a result, millions of tonnes of raw sewage spills, untreated, into the River Thames each year. The Thames Tideway Tunnel (nicknamed the “super-sewer”) is an under-construction 25km tunnel running mostly under the tidal section of the River Thames through central London, which will provide capture, storage and the conveyance of almost all the combined raw sewage and rainwater discharges that currently overflow into the river.

BARGELOADING TUNNEL CLAY FROM A FIXED CONVEYOR

The Telestack TS1550 radial telescopic conveyor loads the tunnel clay onto barges fed from a fixed conveyor as the final part of the land-based logistics system.  The radial telescopic barge loader has the capability of loading 2 barges simultaneously, improving the loading efficiency as well as reducing the changeover times when mooring barges.

Case Study Highlights

  • Country / Region: UK
  • Installation Site: River Thames, London
  • End User: Tideways
  • Product: TS 1550 Radial Telescopic
  • Application: Barge Loading
  • Material Type: Tunnel Clay
  • Tonnage: 1500 tph